A geothermal customer wanted to increase the HP flow in their old Fuji from 194,000#/hr
to more than 500,000#/hr - all within the existing casing geometry. Another geothermal
customer wanted 10% more power from an old straight-condensing impulse-design
steam turbine. And a nuclear customer wanted to eliminate a stress corrosion cracking
problem in the dovetails and reclaim 22 MW of power they'd lost to cracking-related
derates.
TurboCare has solved all these problems and more, leveraging the innovations
we develop for each job to widen the experience base we bring to the next. If
you're thinking about replacing an old unit to gain more efficiency or power,
talk to us first. A TurboCare rerate may achieve your objectives at a fraction
of a new unit's cost.