The generator is routinely overlooked when developing an operation and maintenance program. As generator fleets mature the potential for availability-limiting events caused by the generator increase. However, if an operation and maintenance program is developed early to coincide with the outage windows of the turbine, forced outages can be minimized and the availability requirements managed. TurboCare offers just such a plan with our Generator Assessment Program (GAP).
TurboCare has developed several options within our Generator Assessment Program that allow for varying levels of testing during different types of outages. These options include both rotor-in and rotor-out assessments, with completion time being as low as 12 hours to as much as 7-10 days depending on the option selected. Regardless of the option selected, a GAP inspection by TurboCare will provide valuable information about your generator to ensure that your unit is functioning optimally.